China High-Speed PE Coating Machine Price Sale
1.Brief Introduction
This production line adopts polyethylene (PE) material extrusion machine for film coating. The PE material is absorbed to material canister by automatic drying and material absorbing device. Then the material would be melted, after filter, the melted PE is distributed evenly onto the T shape mould. And finally it can be coated onto base material evenly.
2.Main Features
This is the advance model of PE coating machine. It has multi-extrusion mould, multi- working station, The coating and compouding can be done by one step.
Our machine are using Siemens PLC for easy setting and operation, all parameter can be set by the touch screen.
We are using:
★ ABB Inverter,
★ YASKAWA G7 Inverter
★ SMC Air Cylindar
★ NORGREN Valve
★ OMRON Temperature Controller
★ Hi-Tech Touch Screen
3.Technical Parameter
Model
Items |
SEC-1300 |
Length of mould lip |
1350mm |
Width of finished product |
500~1150mm |
Speed |
180~250m/min, Max 300m/min |
Thickness of PE film |
0.01mm~0.05mm |
L/D ratio for screw |
33:1 |
Max. diameter of roll rewinding & unwinding |
1200mm |
Max extrusion quantity |
240kg/h |
Air consumption |
0.8m 3 /min, 0.8MPa |
Water consumption |
0.6~0.8m 3 /min |
Power |
380V 50Hz, 173kw |
Overall size (mm)
L×W×H |
11,500×8,300×3,600 |
Weight (kg) |
27,000 |
4.Testing & Packing
We testing every machine before shipment.
The machine will be packed and shipped by container.
The machine will be packed by film in standard.
Pls note that The client can choose export standard wooden box packing or export standard wooden pallet packing.
5.FAQ
★About Trade Term
Q-----What's the trade term for making business with us?
A----- FOB,CFR,CIF; It's mainly depend on client's requirement;
★About Delivery Time
Q------What's the Delivery time after placing order ?
A------Usually it takes about 30 days after we received your deposit. However, it would depend on our production line schedule(the timing clients place order)and the manufacturing process of the item.
★ About Payment Term
Q------What's the Payment Term?
A------ By T/T or L/C.