China Paper Tube Surface Grinding Machine Low Price

After-sales Service: Online Support;Technical Video Support
Warranty: 1 Year
Machine Name: Paper Tube Surface Grinding Machine
Tube Inner Diameter: 50mm-120mm
Tube Length: 300mm-1600mm
Tube Thickness: 2mm-20mm
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Shandong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Multi-language Pioneer
6 languages freely used by foreign trade staff. include: English, Portuguese, Russian, German, Italia, Spanish
to see all verified strength labels (15)

Basic Info.

Model NO.
CM-W
Speed
1PC/2mins (for 1600mm Tube)
Power
7.8kw/380V/50Hz
Weight
~0.8t
Dimension
2200mm X 1000mm X 1400
Transport Package
Seaworthy Packing
Specification
as model
Trademark
San
Origin
China (Mainland)
Production Capacity
100sets/Year

Product Description

China Paper Tube Surface Grinding Machine Low Price

1. Brief Description
This machine is for grinding paper tube surface to make paper tube surface smooth and seamless.

2. Technical Parameters
Model CM-W
Tube Inner Diameter 50mm-120mm
Tube length 300mm-1600mm
Tube thickness 2mm-20mm
Speed 1PC/2mins (for 1600mm tube)
Power 7.8KW/380V/50Hz
Weight ~0.8T
Dimension 2200mm X 1000mm X 1400


3. Our Exhibition
China Paper Tube Surface Grinding Machine Low Price
China Paper Tube Surface Grinding Machine Low Price
China Paper Tube Surface Grinding Machine Low Price

 

4.Testing And Packing
We testing every machine before shipment.
The machine will be packed and shipped by container.
The machine will be packed by film in standard.
Pls note that The client can choose export standard wooden box packing or export standard   wooden pallet packing.
China Paper Tube Surface Grinding Machine Low Price
5.FAQ
♦About Trade Term
Q-----What's the trade term for making business with us?
A----- FOB,CFR,CIF; It's mainly depend on client's requirement;  

♦About Delivery Time
Q------What's the Delivery time after placing order ?
A------Usually it takes about 30 days after we received your deposit. However, it would depend on our production line schedule(the timing clients place order)and the manufacturing process of the item.  

♦About Payment Term
Q------What's the Payment Term?
A------ By T/T  or L/C.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now